● Water and Power Stations :


■ Project Name :
Galala WTP

■ Project Location :
Ain Sokhna, Suez, Egypt.

■ Description :
01) Installation of 4 MV-SWGR (24 cells), type: MCSET4.
02) Installation of 8 LV-SWGR (138 cells), type: BLOKSET.
03) Installation of 4 batteries 110 V with charger.
04) Installation of 14 PLC panels.
05) Installation of 4 transformers oil 250 KVA - 0.69/0.4 KV.
06) Installation of 1 transformer oil 250 KVA - 22/0.4 KV.
07) Installation of 2 transformer oil 5 MVA - 22/0.69 KV.
08) Installation of 6 transformer oil 6 MVA - 22/0.69 KV.
09) Assemble of 4 enclosures for transformers 1.5 M.
10) Supply & installation of 4 adaptation flexible copper between transformers & panels.
11) Supply & installation of 12 adaptation copper 6300A between transformers & Busway.
12) Supply & installation of 3 adaptation copper 3200A between transformers & Busway.

For more details please click here


■ Project Name :
10th of Ramadan PWTP expansions with capacity 600,000 m³/day

■ Project Location :
10th of Ramadan City, Al-Sharqeyia, Egypt.

■ Description :
1) Laying of 53343 m cables (different kinds & sizes).
2) Termination of 2604 cables (different kinds & sizes).
3) Erection of 1900 m cable trays & ladders (different sizes).
4) Erection of 912 m conduits (different sizes).
5) Installation of 73 local Control Panel & Junction Box.
6) Installation of MV SWGR panels (22 cells), type: RoNEX.
7) Installation of MV panels (RMU), type: SM6.
8) Installation of LV panels (67 cells), type: BLOKSET.
9) Supply & installation of metal chassis for panel.
10) Supply & installation of enclosure.
11) Installation of 2 dry transformers 2500 KVA.
12) Installation of 2 oil transformers 800 KVA.
13) Installation & assembling of 96 batteries on base panel.
14) Installation of charger panel.

For more details please click here


■ Project Name :
Mostorod WTP expansion

■ Project Location :
Mostorod, Al-Qalyuobia, Egypt.

■ Description :
1) Removal of old panels & Bus-way.
2) Installation of MV panels, type: RoNEX.
3) Installation of new MV Bus-way 11k (At the first time in Egypt).

For more details please click here


■ Project Name :
Abbasyia & Roud El-Farag water stations modifications

■ Project Location :
Abbasyia & Roud El-Farag, Egypt.

■ Description :
1) Provide the drawings & technical study to conduct the requried modifications.
2) Manufacturing & supply the connection copper.
3) Removal of old soft starter circuits.
4) Installation of new soft starter circuits (150HP, 200HP, 350HP, 400HP).

For more details please click here


■ Project Name :
Sheikh Zayed WTP expansion

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of MV SWGR panel (6 cells), type: RoNEX.
2) Installation of MV panel (10 cells), type: MCSET4.
3) Installation of MV panel (6 cells), type: SM6.
4) Installation of 5 LV panels (49 cells), type: BLOKSET.
5) Supply & installation of 2 side panel & Duct between cells.


■ Project Name :
Amriya WTP expansion

■ Project Location :
Amriya, Alexandria, Egypt.

■ Description :
1) Laying of 4065m cables (different kinds & sizes).
2) Termination of 206 cables (different kinds & sizes).
3) Erection of 305m Trays (different sizes).
4) Erection of 81m conduits (different sizes).


■ Project Name :
Maamoura WTP expansion

■ Project Location :
Maamoura, Alexandria, Egypt.

■ Description :
1) Installation of transformer 100K, DC panel, batteries & charger.
2) Supply & Laying of 180m cables (different kinds & sizes).
3) Supply & installation of terminals for 26 cables (different kinds & sizes).
4) Supply & erection of 120m conduits ¾ inch.
5) Installation of earth bar 50×5mm with insulators.


■ Project Name :
Km 4.5 WTP modifications

■ Project Location :
4.5k, Nasr City, Cairo, Egypt.

■ Description :
1) Supply & installation of Adaptation copper.
2) Supply & Installation of 8 cables 240mm & termination of them.


■ Project Name :
New west Damietta power station

■ Project Location :
Damietta, Egypt.

■ Description :
1) Installation of MV panels (42 cells), type: RoNEX.
2) Installation of LV panels (60 cells), type: BLOKSET.
3) Installation of 2 dry transformers (1.2, 1.5, 4M).
4) Installation of Busways 2500A, 3200A, & 6300A.


● Gas & Petroleum Stations :


■ Project Name :
Petrobel station

■ Project Location :
Abu Rudeis, South Sinai, Egypt.

■ Description :
1) Installation of MV panels (26 cells), type: RoNEX.
2) Installation of LV panels (22 cells), type: BLOKSET.
3) Supply & Installation of 2 Adaptations 4000A & 2 boxes.


■ Project Name :
UGDC station

■ Project Location :
Port Said, Egypt.

■ Description :
1) Installation of LV panel, type: Blokset.
2) Installation of CT-4000A.
3) Installation of NSX-400A.
4) Laying of Cables.


■ Project Name :
SUMED station

■ Project Location :
Ain Sukhna, Suez, Egypt.

■ Description :
1) Installation of LV panel (6 cells), type: BLOKSET.
2) Installation of Busway 1200A.
3) Supply & Installation of Adaptation 1200A.


■ Project Name :
GASCO station

■ Project Location :
5th District, New Cairo, Egypt.

■ Description :
1) Retrofit & install of breakers NS1600 instead of CM1600.


● Steel factories :


■ Project Name :
Arcelor Mittal factory

■ Project Location :
Bader City, Egypt.

■ Description :
1) Installation of 4 MV cells (RMU), type: SM6.


■ Project Name :
Roots steel factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of Busway (with length 600 m & height 10 m).


■ Project Name :
Ezz El-Dekhila factory

■ Project Location :
Alexandria, Egypt.

■ Description :
1) Retrofit & install of breakers NS-1250 instead of ND-63F120.
2) Retrofit & install of breakers NS-1250 instead of NF-1200-SS.


■ Project Name :
Arco Steel factory

■ Project Location :
5 industrial Zone, Sadat City, Monofiya, Egypt.

■ Description :
1) Installation of 3 LV panels, type: BLOKSET.
2) Retrofit & installation of 20 breakers (100-4000A).


● Cement factories :


■ Project Name :
Tourah Cement factory (ASEC)

■ Project Location :
Helwan, Cairo, Egypt.

■ Description :
1) Supply & Installation of Adaptation 5000A.
2) Installation of breaker NW-5000A.


■ Project Name :
Titan Cement factory

■ Project Location :
Alexandria, Egypt.

■ Description :
1) Installation of MV panel (5 cells), type: RoNEX.


■ Project Name :
Sinoma Cement factory

■ Project Location :
Bani Swaif, Egypt.

■ Description :
1) Dismantling, perforation & installation of copper bars for incoming cables of MCSET cells.


● Chemical industries factories :


■ Project Name :
El-Nasr company for intermediate chemicals (NCIC)

■ Project Location :
Ain Sokhna, Suez, Egypt.

■ Description :
1) Retrofit of LV panels, type: BLOKSET.
2) Supply & installation of Adaptation copper between Breaker NW40 & Bus-way 4000A.
3) Supply & installation of Adaptation copper between Transformer & Bus-way 4000A.
4) Supply & installation of sheet metal box between Transformer & Bus-way 4000A.
5) Supply & installation of 2 Adaptations copper between Transformer & Bus-way 3200A.
6) Supply & installation of 2 sheet metal boxes between Transformer & Bus-way 2500A.
7) Design of all necessary drawings.

For more details please click here


■ Project Name :
Egyptian Fertilizer Company (EFC)

■ Project Location :
Ain Sukhna, Suez, Egypt.

■ Description :
1) Installation of MV panels, (Areva cubicles) type: WK.


● Medical Products factories :


■ Project Name :
EIPICO factory

■ Project Location :
10th of Ramadan City, Al-Sharqeyia, Egypt.

■ Description :
1) Supply & Installation of 9 Adaptations.
2) Remove & Installation of 4 Dry Transformer 2M.
3) Installation of 16 feeder Bus-ducts 4000A.
4) Installation of 2 Busduct line 6300A & 2500A.
5) Retrofit 3 Adaptations & 4 breakers NW-2000A, NW-4000A.
6) Supply 2 Adaptation 4000A, 6300A & boxes for Transformer.


■ Project Name :
Pharma Pack factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of MV SWGR panel (8 cells), type: MCSET4.
2) Installation of RMU panel (16 cells), type: SM6.
3) Installation of Busduct (more than 130 meters).
4) Supply & Installation of 4 Adaptations.
5) Termination of 20 MV cables.
6) Retrofit of Adaptation between Bus-duct & LV panel.


■ Project Name :
P&G Baby Care factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of Busway 4000 A.
2) Supply & Installation of Adaptations & boxes.


■ Project Name :
Glaxo Smith Kline factory (GSK)

■ Project Location :
Giza, Egypt.

■ Description :
1) Installation of 21 CT & Barometers.
2) Remove & Installation of LV panels.


■ Project Name :
Glaxo Smith Kline factory (GSK)

■ Project Location :
El-Salam City, Cairo, Egypt.

■ Description :
1) Installation of LV panel (9 cells), type: Blokset.
2) Laying of output cables(3×300mm) from RMU(SM6) to MV-SWGR.
3) Supply & install of ends of output cable (300mm) for RMU(SM6).


● Foods & Drinks factories :


■ Project Name :
BERICAB factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of LV panel (23 cells), type: BLOKSET.
2) Installation of 2 dry transformers.
3) Installation of Busways (800-4000A), with length more than 380m & height 8.5m.
4) Supply & Installation of 2 Adaptations 4000A.


■ Project Name :
Kraft foods factory

■ Project Location :
Burj Al-Arab, Alexandria, Egypt.

■ Description :
1) Retrofit & installation of breakers NSX(250-800)A.


■ Project Name :
Nestle factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of MV panel, type: MCSET.
2) Remove & installation of MV panel (RMU), type: SM6 4F.
3) Installation of LV-SWGR panel.


■ Project Name :
Nestle ice cream factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Retrofit breaker NS 800A.
2) Supply & installation of iron sheets to cover breaker NS 800A.


■ Project Name :
Juhayna factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Retrofit & installation of breakers NW-600A & NS-1000A.
2) Remove & installation of LV panel, type: BLOKSET.
3) Supply material for control devices.
4) Modifying control circuitry from manual to automatic.


■ Project Name :
AJE Egypt factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Maintenance for motors 4HP.
2) Installation of overloads for LV panel.
3) Supply & installation of cables to connect panels.
4) Supply & installation of 3 floats.


■ Project Name :
Edita factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Retrofit & installation of breakers NSX-400A & NSX-250A.


■ Project Name :
Mondelez factory

■ Project Location :
10th of Ramadan City, Al-Sharqeyia, Egypt.

■ Description :
1) Supply earth cables, terminals, ducts, stickers, & necessary accessories for retrofit LV panels.


■ Project Name :
Misr Glass Manufacturing factory (MGM)

■ Project Location :
Mostorod, Qalyubia, Egypt.

■ Description :
1) Remove 2 LV-SWGR, type: OKKEN (6300A).
2) Installation & retrofit of LV-SWGR (16 cells), type: OKKEN (6300A).
3) Installation of 2 Bus-way 5000A & 6300A.
4) Dry transformer 3150 KVA, IP21.
5) Supply & installation of Adaptation 6300A.


● Other Places & Factories :


■ Project Name :
Benha Electronics Renovation

■ Project Location :
Benha, Egypt.

■ Description :
1) Dismantling an old MV-SWGR.
2) Installing a new MV-SWGR.
3) Completing all necessary civil works & making a concrete zero level floor under the SWGR.

For more details please click here


■ Project Name :
Helwan Factory Renovation

■ Project Location :
Helwan, Cairo, Egypt.

■ Description :
1) Build a full room (5.8×2.5m), includes: floor & roof concretes, paints & lighting.
2) Build a concrete sidewalk (Includes: Supply the necessary materials).
3) Expand the new room from (5.8×2.5)m to (6.4×3.3)m.
4) Make a concrete base in front of the door of old room, with dimensions (2×2m) × thickness (40cm).
5) Make a concrete layer for the new room floor fully (3.3×6.4m), with thickness (15cm).
6) Drilling of 2 trenches to pass cables of 2 capacitor panel (Includes: supply iron cover).
7) Drilling of a new ground hole (1×1×3m) + fix copper plate (1×2)m×5mm + fix copper bar (10cm×10mm×3m) + laying of copper cable 50mm from the hole to the old room, to achieve 2 Ohm.
8) Optimize of 2 ground holes & connect it with panels.
9) Removal of tiles of old room roof, retrofit & insulation of the roof, & supply & erection new tiles & gutters to dispose the water.
10) Format the room floor & paint it by Epoxy (20×5.8m).
11) Paint a room with size (20×5.8×6m) from inside & outside.
12) Supply & installation of full lighting of the old rooms (Lamps/ Sockets/ Wires/ Pipes).
13) Supply & installation of 5 Air conditioning 2.5 HP (Includes: accesseries & copper pipes).
14) Supply & installation of 3 chasiss for MV panel & capacitor panel.
15) Supply & installation of cable terminals (3×240mm).
16) Supply & laying 35m of Aluminum cable (3×240mm).
17) Supply & installation of external sanitation materials.
18) Supply & installation of fire doors & windows.
19) Supply & install iron borders thickness (5×30mm) to protect 4 windows from outside.
20) Supply & install a fan (Toshiba) in the new room & 3 headlamps 1kW (El-Sewedy) over the building.
21) Removal & installation of 18 MV cells & 8 capacitor cells (Includes: remove & install cables).
22) Installation of transformer, batteries, & charger.

For more details please click here


■ Project Name :
International Drilling Material Manufacturing Co. (IDM)

■ Project Location :
Ain Sokhna, Suze, Egypt.

■ Description :
1) Installation of Busway 4000A.
2) Installation of RMU panel, type: SM6.
3) Installation of LV-SWGR, type: BLOKSET.
4) Supply & installation of Adaptation copper between TR & BW 4000A.
5) Laying & termination of cables (More than 6000m).
6) Supply manufactured copper bars.

For more details please click here


■ Project Name :
UPTOWN CAIRO City

■ Project Location :
Mokttam, Cairo, Egypt.

■ Description :
1) Installation of MV panels, type: (SF6, RONEX &MCSET4).
2) Installation of LV panels, type: BLOKSET.
3) Installation of ATS 45K.
4) Installation of capacitor bank.


■ Project Name :
Palm Hills City

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of protection devices.
2) Installation of 3 MN & phase sequence.


■ Project Name :
CPC complex

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Supply & installation of 5 Adaptations 2500-4000A between transformers & Bus-way, with silverd plated.
2) Supply & installation of 2 Bus-way boxes.


■ Project Name :
IKEA store

■ Project Location :
Cairo Festival City, New Cairo, Egypt.

■ Description :
1) Installation of MCB panels.
2) Retrofit 5 Adaptations between panels, transformers & Busway.


■ Project Name :
6th of October University

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of MV panels , type: SF6.


■ Project Name :
LOREAL factory

■ Project Location :
10th of Ramadan City, Al-Sharqeyia, Egypt.

■ Description :
1) Remove & installation of NSX (100A : 1600A).
2) Installation of micro logic (2.3 & 5).


■ Project Name :
GSE factory

■ Project Location :
6th of October City, Egypt.

■ Description :
1) Installation of 6 LV panels, type: BLOKSET.
2) Laying of 40 meters (special cables).
3) Termination of 16 cables.


■ Project Name :
Development Services Center

■ Project Location :
Maadi, Cairo, Egypt.

■ Description :
1) Supply & installation of 5 Adaptations (2000A).
2) Supply & installation of 5 Adaptations (1600A).


■ Project Name :
Cairo Financial Center (CFC)

■ Project Location :
Mokattam, Cairo, Egypt.

■ Description :
1) Supply & installation of Adaptation between breaker NW20 & Busway.
2) Retrofit of Adaptation between breaker NW25 & Busway.


■ Project Name :
Sahl Hasheesh for solar energy (KarmSolar)

■ Project Location :
Hurghada, Red Sea Governorate, Egypt.

■ Description :
1) Supply & installation of flexible link between transformer & copper of LV panel.